Enerzone Solution 3.5 Manuel D'installation Et D'utilisation page 170

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for: Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on 9/6/2018 2:01:07 PM
Regional Certification Center.
The Listing Report will provide the Applicant with a guide for the operation of the certification program.
In the case where a discrepancy exists between the product and the Listing Report, the Listing Report
currently on the SpecDirect website will be considered correct, and therefore the Applicant has the
responsibility for making the necessary corrections so that the product will meet the specifications stated
herein.
By signing the Certification Agreement, Manufacturers agree to the same terms and conditions as the
Applicant.The Applicant is to use this Report as a guide for the operation of the certification program, and
will manufacture the Listed product(s) in accordance with the specifications information stated herein.
CERTIFICATION MARK
The Intertek Certification Mark applied to the products shall either be separable in form, such as labels
purchased from Intertek, or on a product nameplate or other media only as specifically authorized by
Intertek. Use of the Intertek Certification Mark is subject to the control of Intertek.
MANUFACTURING AND PRODUCTION TESTS
Manufacturing and Production Tests shall be performed as required in the Factory Audit Manual, or
Manufacturing Section found in the Listing Report.
FOLLOW-UP SERVICE
Follow-up Service Inspections of the manufacturing facility shall be conducted by Intertek and shall
be unannounced unless otherwise permitted by Intertek. A Periodic Inspection Report (PIR) shall be
issued after each visit.
Special attention will be given to the following:
1. Conformance of the manufactured product to the descriptions in the Listing Report.
2. Conformance of the use of the Intertek Certification Mark with the requirements of the
Listing Report and the Intertek Certification Agreement.
3. In-plant quality control procedures and personnel.
4. Manufacturing processes and changes.
5. Performance of specified manufacturing and production tests.
6. Collection of Verification samples for confirmatory testing, if applicable.
In the event that the Intertek Field Representative identifies variance(s) to any provision of the
Listing Report, the Applicant shall take one or more of the following actions:
1. Correct the non-conformance.
2. Remove the Intertek Certification Mark from non-conforming product.
3. Contact the Intertek Certification office (bpcerthelpdesk@intertek.com) for additional
instructions.
Stove Builder International Inc. | 44826 | Rev: Aug 31 2018 3:17PM | Uncontrolled Copy
Page 178 of 201

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Eb00053

Table des Matières