Enerzone Solution 3.5 Manuel D'installation Et D'utilisation page 153

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for: Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on 9/6/2018 2:01:07 PM
Test report 103536746MTL-002 (6 of 21)
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103536746MTL-002
Date: 07/13/18
AIR SUPPLY SYSTEM
Combustion air enters at the bottom of the heater, which is directed to the firebox. All gases exit
through the 6" flue located on top of the heater.
TEST FUEL PROPERTIES
The species of fuel used was mainly beech. The fuel was split cordwood of nominal length of 16
inches. The fuel was dried in air to an average moisture content between 18% and 28% on a dry
basis. Cordwood fuel was loaded from side to side into the firebox per manufacturer's
instructions.
SAMPLING LOCATIONS
Particulate samples are collected from the dilution tunnel at point 20 feet from the tunnel
entrance. The tunnel has two elbows and two mixing baffles in the system ahead of the sampling
section. (See Figure 3.) The sampling section is a continuous 13-foot section of 8-inch diameter
pipe straight over its entire length. Tunnel velocity pressure is determined by a type "S" Pitot tube
located 100 inches from the beginning of the sampling section. The dry bulb thermocouple is
located on the pitot tube. Tunnel samplers are located 48 inches downstream of the Pitot tube
and 36 inches upstream from the end of this section. (See Figure 1.)
Stack gas samples are collected from the steel chimney section 8 feet ± 6 inches above the scale
platform.
Version: 05/10/17
Stove Builder International Inc. | 44826 | Rev: Aug 31 2018 3:17PM | Uncontrolled Copy
Page 6 of 21
8431 Murphy Drive
Middleton, WI 53562
Telephone: 608-836-4400
Facsimile: 608-831-9279
www.intertek.com/building
GFT-OP-10c
Page 161 of 201

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Eb00053

Table des Matières