Electrical Installation - Oase Water Trio Notice D'emploi

Masquer les pouces Voir aussi pour Water Trio:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
Installation
Attention! Dangerous electrical voltage.
Possible consequences: Death or severe injury.
– Install transformer and 12 V control box at a dry, splash-water protected place. Additionally protect the
12 V control box against sun radiation (max. 40 °C).
– During operation, ensure that both the transformer and the 12 V control box are placed at a 2 m
safety distance from the bank (D).
Installing the Water Trio / Water Quintet (B, C):
Variant 1 (B):
– Install the unit as horizontally as possible in the water on a firm ground.
– The minimum water level must be just above the pumps (8).
Variant 2 (C):
In the case of excessive water depth, the extension tubes (6) can be used to compensate. If not sufficient, select a dif-
ferent suitable place of installation.
– To open, release the nozzle holders (9) by slightly turning them at the housing top section (10) and remove.
– Unscrew the LED light nozzle (11).
– Screw the extension tubes (6) between the LED light nozzles (11) and the pumps (12).
– Close the unit by placing the housing top section (10) on the LED light nozzles (11) and fasten using the nozzle
holders (9).
– Install the unit as horizontally as possible in the water on a firm ground.
– The minimum water level must be just above the pumps (8).
Note: Ensure that the water inlet at the unit underside is not impaired!
Install the 12 V control box at a place protected from sun radiation (max. 40 °C).
Variant 1 (E):
– Push the ground stake (5) fully into the ground at the desired position.
– Slide the 12 V control box (3) onto the ground stake (5).
Variant 2 (F):
– Screw the 12 V control box (3) to the ground using 4 screws (13) (not included in our scope of delivery) through
the fastening slots (14) in the housing of the 12 V control box (3).
Installation of the transformer (G):
Install the transformer (2) close to the 12 V control box (3).
Note: Ensure that the cables are routed strain relieved!

Electrical installation

Connect the unit to the 12 V control box (G, H):
– Plug the pump plugs (18) as well as the LED light nozzle plugs (20) into the respective sockets for the pump (19)
and the LED light nozzles (21) of the 12 V control box (3). Note the order of the plugs (plugs are marked).
– Insert the connection cable (17) of the transformer in the rear socket (15) of the 12 V control box (3), then screw-
tighten the cable with the union nut (16).
– Fit the protection sleeve (4) over the 12 V control box (3).
Commissioning/start-up
Switching on the unit (I): Plug the power plug (22) of the transformer into the socket.
– The Water Trio / Water Quintet starts with program 1 (see chapter Operation).
Switching off the unit (I): Disconnect the power plug (22) of the transformer.
- EN -
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Water quintet5018750240

Table des Matières