Christopeit Sport SP 10 Mode D'emploi page 26

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 11:
Installation of cable 3 for latissimus (74) with double pulley holder
(55).
1. Pull cable 3 (74) with screw end through the big holes of top cross beam
(6) and around the pulleys as fi gure shows and connect the screw end
with weight disc bar (39). During installation of cable 3 (74) the two pulleys
(23A) have to assemble into appropriate position at top cross beam (6) by
using screws M10x65 (16), bushings (47) and nuts M10 (18).
The bushings (47) has to put from outer side into the holes of
top cross beam (6).
(Note: To get a smooth sliding cable system, you may adjust
the cable system at the chain (71) with carbine hooks (81)
through setting them into another position.)
2. Connect the latissimus bar (15) at cable 3 (74) by using carbine
hook (81). To storage the latissimus bar (15) you can put it on
the appropriate holder in front of the top cross beam (6).
Step 12:
Installation of weight cover (4) with weight cover support (43+43a).
1. Connect the weight cover support (43) on top and bottom side of weight
cover (4). Then screw the weight cover support (43a) in the middle of
weight cover (4) by using screw M6x15 (44), washer 6//12 (45) and nut
M6 (46).
2. Attach the weight cover (4) with pre-assembled weight cover supports
(43+43a) to the weight cover bracket (35) and screw them tightly by using
screw M6x15 (44), washer 6//12 (45) and nut M6 (46).
3. Finally secure the fi xing tube (42) on top of weight cover bracket (35)
with screw (48).
26

Publicité

Table des Matières
loading

Table des Matières