Transport And Installation; Handling; Inspections; Positioning And Installing The Machine - FOM INDUSTRIE SIKA PLUS Manuel D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5

TRANSPORT AND INSTALLATION

The machine is delivered in one of the following ways:
packed on a wooden pallet, packed on a wooden pallet
and in cartons, packed on a wooden pallet and in a
wooden crate.
Inside the machine (clearly in sight), the customer will find
not only the instruction manual, but also a pack containing
the tool kit and the elements for anchoring to the ground.
5.1
HANDLING (Fig. 05-01)
The machine, packed or not, has to be handled carefully
and with suitable fork lift. When lifting or picking up before
positioning, make sure not to damage the most fragile
parts, namely cables or hoses, using suitable equipment.
5.2

INSPECTIONS

-
Make sure that environment has no areas in shadow,
dazzling rays or dangerous stroboscopic effects due
to lighting.
-
Make sure that no damage occurred during transport.
-
Make sure that machine rests evenly on floor.
-
Make sure that there is enough room around the
machine to carry out all maintenance operations
safely and easily.
5.3
POSITIONING AND INSTALLING THE
MACHINE
After choosing the place, installation begins.
Secure the machine to the floor using the two corner
brackets "A" - Fig. 05-02 supplied with it.
Secure the brackets to the machine and floor as shown in
Fig. 05-02 below, make sure that the machine is level (if
necessary, place little pieces of plate under the stand)
before fixing the corner brackets).
A
39
GB
SIKA PLUS
05-01
05-02

Publicité

Table des Matières
loading

Table des Matières