EdilKamin FANTASY Installation page 35

Masquer les pouces Voir aussi pour FANTASY:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 49
2nd SOLUTION: IT 11 BIS (code 6
Note: THE PIPES ON THE HOT AIR OUTLETS MUST BE FITTE BEFORE APPLYING THE CO ERINGS AN
PRIOR TO ISASSEMBLY OF THE UPPER CAST IRON SI E FLAN . THE FIRST PART OF THE FLEXIBLE
PIPE MUST BE COMPLETELY RELAXE
THE INTERNAL IAMETER
- e ne the position of the stove with respect to the walling ( g. a).
- isassemble the upper part of the bac (
pipes ( g. b).
- ctivate the hot air channelling control lever ( ), removing the loc ing plate (
- ut the ue cover to size ( ) on the wall side ( g.c)
- lace the stove in its de nite position.
- E tend the aluminium pipe ( ) for hot air channelling, without connecting the stove outlet.
- Fit the medallion ( ) on the aluminium pipe and the pipe cover ( a) without loc ing it in ( g. c).
- Fit the aluminium pipe to the hot air outlet on the bac of the stove ( ) ( g. d).
- Replace the upper part of the bac (
- lace the pipe cover ( ) in the de nite position and fasten it to the bac of the stove with the supplied screws (7) ( g. d).
- nstall the terminal outlet ( ) and its aluminium pipe ( ) fastening it with the wall collar (9) and the dowels with screws ( - ) ( g. d).
- Fasten the wall medallion ( ) with silicone ( g d).
g. a
g. c
6
g. d
8
7
6
o
pipe
Smo e outlet end-piece
all medallion
a
Flue cover
7
Flue cover fastening screws
ipe bloc ing clamp
9
all collar
Screws
owels
INSTALLATION
1 ) - NON-A
IN SUCH A AY TO ELIMINATE CORRUGATION. IN THIS
ILL BE SLIGHTLY ENLARGE TO FA OUR ENTRANCE.
) and remove one of the two predrilled caps in correspondence with the hot air outlet
).
g. b
2
5
8
5
4
ACENT ROOM ONLY
) ( g. b).
132
133
13
132
10
6
- 35
-
1
5
7
4
9
8
9
4
9
10
8
2
5
n
AY
2
6
6a
9
10 11
S
9
9
9
9
7
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

FataSirenaStory

Table des Matières