Owner's Responsibilities - Blodgett Combi CNV14E Manuel D'installation

Masquer les pouces Voir aussi pour CNV14E:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Owner's Responsibilities

Installation responsibilities prior to service
startup inspection
You are entitled to a free start-up inspection ser-
vice by our factory ASAP . Before a factory repre-
sentative arrives to perform a startup procedure,
the owner must already have satisfied the follow-
ing requirements.
Gas Type
U.S. and Canadian Installations
Natural
65,000 BTU/Hr
Propane
65,000 BTU/Hr
3/4" FNPT connector for all U.S. and Canadian installations
Voltage
Hz
208
60
208
60
240
60
240
60
480
60
380/220
50
415/240
50
400/230
50
RATINGS -- GAS APPLIANCES -- CNV14G/AA
Gas Input
Voltage
208-240
208-240
RATINGS -- ELECTRIC APPLIANCES -- CNV14E/AA
Max Load (amps)
Phase
L1
1
89
3
52
1
82
3
47
3
23
3
25
3
27
3
26
1. Oven(s) are uncrated, stacked (if applies) and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking.
Maximum shelf loading -- 100 lbs (45.5 Kg)
Phase
Amps
1
15
120
1
15
1
15
120
1
15
L2
L3
89
---
1/2HP 208-240VAC, 50/60 Hz
52
52
1/2HP 208-240VAC, 50/60 Hz
82
---
1/2HP 208-240VAC, 50/60 Hz
47
47
1/2HP 208-240VAC, 50/60 Hz
23
23
1/2HP 208-240VAC, 50/60 Hz
25
25
1/2HP 208-240VAC, 50/60 Hz
27
27
1/2HP 208-240VAC, 50/60 Hz
26
26
1/2HP 208-240VAC, 50/60 Hz
4
Motor
1/2HP 208-240VAC, 50/60 Hz
1/2HP 208-240VAC, 50/60 Hz
1/2HP 208-240VAC, 50/60 Hz
1/2HP 208-240VAC, 50/60 Hz
Motor

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cnv14g

Table des Matières