Télécharger Imprimer la page

Mennekes AMTRON Wallbox Guide D'utilisation page 11

Masquer les pouces Voir aussi pour AMTRON Wallbox:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 21
fåëí~ää~íáçå=çå=~å=ÉñáëíáåÖ=ÄÉÇéä~íÉ=
Fig. 3: Installation of concrete column (existing bedplate)
The operator / owner is responsible for the secure installation
of the charging system according to the following
specification.
For mounting, MENNEKES recommends threaded bolts
and nuts both made of stainless steel with a strength
class of at least 70 (tensile strength 700 N/mm²). Use
only threaded bolts and nuts made of stainless steel to
prevent corrosion.
For an existing foundation, the mounting holes must be
drilled on site. The hole diameter must be selected according
to the chosen mounting hardware.
The necessary mounting hardware is not included.
A
1
Drill holes
in existing bedplate according to scale
drawing. Route connecting cables through an empty
conduit. Cable length from top edge of bedplate approx.
2.5 m!
B
Route connecting cables
conduits in the concrete column as illustrated.
B
Place concrete column on bedplate and secure with
suitable screw, bolt or composite anchors
HUS3, MKT BZ Plus A4). Follow the installation
instructions by the manufacturer of fasteners!
Alternatively, a prefabricated bedplate can be purchased
directly from Mönninghoff. For ordering information see
page 6.
2
through one of the empty
3
(e.g. Hilti
EN
3

Publicité

loading