Hitachi NT 50AE Mode D'emploi page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
(2) Adjust the air pressure to 70 psi (4.9 bar, 5 kgf/cm
Connect the air hose.
Do not load any nails in the Nailer.
THE NAILER MUST NOT LEAK AIR.
Hold the Nailer downward and pull the trigger.
THE NAILER MUST NOT OPERATE.
(3) With finger off the trigger, depress the push lever against the workpiece.
THE NAILER MUST NOT OPERATE.
(4) Without touching the trigger, depress the push lever against the workpiece.
Pull the trigger.
THE NAILER MUST OPERATE
(5) With the Nailer off the workpiece, pull the trigger.
Depress the push lever against the workpiece.
THE NAILER MUST OPERATE.
(6) If no abnormal operation is observed, you may load nails in the Nailer.
Drive nails into the workpiece that is the same type to be used in the actual application.
THE NAILER MUST OPERATE PROPERLY.
14
2
).
Depress Push Lever
Pull Trigger
Do not pull
Trigger

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nt 32aeNt 50aesNt 32aes

Table des Matières