Télécharger Imprimer la page

Camoplast ATV T4S Directives D'installation page 18

Masquer les pouces Voir aussi pour ATV T4S:

Publicité

Page 12
8. Attach the stabilizing rod (B) to the anchor
bracket (A), using the spacer bushings (C), the
flat washer (D) and nut (E). Torque to 70 N•m
[52 lb•ft]. Refer to Figure 13.
NOTE: Ensure that parts are assembled in the
correct order.
Figure 13
9. Verify that spring assembly bolt (F) is tightened
to the recommended torque specification: 40
N•m [30 lb•ft]. Refer to Figure 14.
Figure 14
10. Inspect the rear track systems and ensure that
all mounting bolts were correctly tightened
during installation. Lower the ATV to the ground
and proceed to install the front track systems.
Installation Guidelines / Directives d'installation
8. Fixer le bras stabilisateur (B) au boulon déjà
installé sur l'ancrage de suspension (A) à l'aide
des espaceurs (C), de la rondelle (D) et de
l'écrou autobloquant (E). Serrer à un couple de
70 N•m [52 lb•pi]. Voir la Figure 13.
NOTE : Assurez-vous d'assembler les pièces dans
l'ordre indiqué.
9. Vérifier que le boulon du ressort (F) est serré au
couple recommandé : 40 N•m [30 lb•pi]. Voir la
Figure 14.
10. Inspecter les systèmes de traction arrière et
s'assurer que tous les boulons ont été serrés
correctement lors de l'installation. Abaisser
ensuite le VTT au sol et procéder à l'installation
des systèmes de traction avant.
©2015 Camoplast Solideal Inc.

Publicité

loading