Assembly And Operation; Applications; Removal And Installation Method Of Battery - Hitachi P 20DA Mode D'emploi Et Instructions De Securite

Masquer les pouces Voir aussi pour P 20DA:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

ASSEMBLY AND OPERATION

APPLICATIONS

Planing various wooden planks and panels.
(Planing)
(Side planing of flush door)

REMOVAL AND INSTALLATION METHOD OF BATTERY

Handle
Switch
Trigger
Battery
Fig. 4
12
15/64" (Max)
(6 mm)
Side face cutting
Pull out
Insert
Latch
Push
15/64" (Max)
(6 mm)
(Beveling)
Fig. 3
How to install the battery.
Align the battery with the groove in tool tail
and slip it into place.
Always insert it all the way until it locks in
place with a little click, If not, it may acciden-
tally fall out of the tool, causing injury to
you or someone around you. (Fig. 4)
How to remove the battery.
Withdraw battery from the tool tail while
pressing the latch on the underneath of the
battery. (Fig. 4)
15/64" (Max)
(6 mm)
(Rabbeting)

Publicité

Table des Matières
loading

Table des Matières