Ups Internal Battery Connection - Eaton Powerware 9125 Guide D'installation

Pour applications ibm
Masquer les pouces Voir aussi pour Powerware 9125:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION

UPS Internal Battery Connection

NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
To ensure proper battery operation before installing the UPS:
1.
2.
3.
4.
2
EATON Powerware
Verify that the UPS is off and unplugged.
Remove the UPS front cover (see Figure 1).
Figure 1. Removing the Front Cover
Connect the internal battery connector (see Figure 2).
Figure 2. Connecting the Internal Battery Connector
Reinstall the UPS front cover (see Figure 3).
Figure 3. Reinstalling the Front Cover
®
9125 (9910-P10, P11, P15, P16) UPS Installation Guide for IBM
®
S
Applications
164201633 Rev A

Publicité

Table des Matières
loading

Table des Matières