Start-Up And Operation - asecos APA.145.75 Mode D'emploi

Sorbonne de laboratoire
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
HF.GE.18678
Support frame, standing work, (H x W x D) 865 x 900 x 625 mm, with facing panel for size 59 cabinet
EP.ML.25321
Optional cover for pharmaceutical exhaust APA.145.75, RAL 7035
EP.ML.22495
Optional cover for pharmaceutical exhaust APA.145.90, RAL 7035
Please contact your local specialised dealer.
6. Start up and operation
The hazardous material workplace is intended for a work bench with a depth of at least 600 mm. The load-bearing
capacity of the bench must be at least 100 kg/m 2 . After placing the hazardous material workplace onto the work bench,
please check whether the hazardous material workplace is in a horizontal position. Otherwise please align the hazardous
material workplace horizontally by underlaying with strips.
The customer must provide a sufficiently sized extraction air connection prior to commissioning of the hazardous ma-
terial workplace.
There is an earthed plug with 4 m cable on the rear wall of the hazardous material workplace for connection to the
power supply. The green LED ("mains") must light up after the self-test. Now press the On/Off switch to put the hazar-
dous material workplace into operation ("Ventilation On/Off"). The green LED ("Operation") must light up as well as
the integrated lamp.
Please use the continuous handle to open and close the sliding window.
Please press the On/Off switch to switch off the hazardous material workplace.
If the hazardous material workplace has an option for media supply, the operation of the gas and water outlets (posi-
tioned on the inside rear wall) is possible by way of rotary valves on the menu bar.
CAUTION: Gas tapping is only possible if the rotary valve is slightly depressed beforehand. The hazardous material
workplace must be subjected to a safety check before use.
7. Functional and safety inspection, care and maintenance
The hazardous material workplace is a safety-related equipment, which must, in accordance with § 4 section 3 Work-
places Ordinance, be maintained at least once a year and tested for function by a specialist. The functional capability is
checked by means of the integrated air monitoring, such that a functional check of the hazardous material workplace
is continuously performed during operation.
Disassembly of the baffle wall: The baffle wall can be removed for cleaning by loosening the four knurled screws.
Please clean the hazardous material workplace using ordinary, mild household cleaner.
8. Please act as below in response to malfunctions:
Malfunction
Green LED "Mains" not illuminated
Green LED "Operation" does not light up after switching
on
Integrated lamp cannot be switched on
The red LED "Malfunction exhaust air" lights up during
operation
Sliding window is difficult to operate or cannot be ope-
rated at all
NOTE: In case of defects, please contact your local specialised dealer.
16
Reason — action
Check whether power is connected
• Green LED "Mains" is faulty. Call service.
• The electronic system is faulty. Call service.
Check whether power is connected
• Green LED "Operation" is faulty. Call service.
• The electronic system is faulty. Call service.
• Bulb defective. Please replace.
• Exhaust air malfunction. Check pressure loss of exhaust
air pipe
• Exhaust fan defective. Replace fan.
• Counterweight not exactly positioned. Call service.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Apa.145.90

Table des Matières