Inspection; Periodic Maintenance; Maintenance With Petrol Engine - ENAR ENARCO BOXEL M2 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1-
2-

4.5 INSPECTION

Before starting the job, check the correct working of all handling and safety devices
Inspect regularly the good conditions of the feeding cables.
Inspect regularly the connection voltage.
The converter should only be used in conjunction with all safety elements.
If defects are found in the safety devices or other defects which could reduce the safe handling of
the equipment, notify immediately the proper responsible person.

4.6 PERIODIC MAINTENANCE

-Only an expert shall work on the electrical parts.
-Make sure that the current is off during repairs.
-In all maintenance operations, original parts will be used.
-A periodic lubrication of the converter bearings is not necessary.
-The electrical earth wire (green-yellow) should be longer to avoid being the first one in cutting in
case of breaking of wires. After maintenance, control the current through the earth cable .
-Clean the ventilation vents in the front and back part of the converter periodically to avoid
overheating.
-After maintenance job and service, all safety devices should be assembled correctly.
-After working 40 hours inspect the frame holding bolts.
-Every 12 months or more frequently, depending on the usage conditions, it is recommended an
inspection be done by an authorized dealer.
-During the maintenance, secure that the device is disconnected from the power source.

4.7 MAINTENANCE WITH PETROL ENGINE

FRECUENCY CONVERTERS
AFGH2000, AFGB2000, AFDY2000, AFDH4500, AFE, BOXEL
ELECTRIC GENERATOR
Make sure the cables are in good condition.
When a defect or a malfunction has been detected, endangering the use of this machine or
not, stop the work and make the correspondent maintenance to avoid any danger or bigger
damage.
1.
Daily (8 hours).
Clean the motor and the beams, check the bolts & nuts, check and fill the exciters'
and motors' reservoir with the respective oils.
2.
Weekly (50 hours).
Change the motor oil (first 20 hours), clean the sparking plugs and the air filter.
3.
Monthly (200 hours).
Clean the oil filter, clean and adjust the sparks plugs.
4.
Every 500 hours.
Clean and set the carburettor, clean the cylinders' head, set the valves.
5.
Always use original parts by every maintenance operation.
6.
The safety fittings have to be checked after every maintenance.
7.
The screed has to be sent to an authorized workshop for service every 12 months
or more frequently according to the intensity of the usage.
8.
Do not fill the petrol reservoir while smoking or near any other potential source of
danger.
en
9

Publicité

Table des Matières
loading

Table des Matières