Measures To Be Taken Before Putting Into Service - Burkert 6510 Instructions De Service

Masquer les pouces Voir aussi pour 6510:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION, INITIALISATION AND SERVICE
Wall mounting
Fix the module system directly to the wall using M3 screws.
Plug-in connections
For plug-in connections, the hose lines must meet the following requirements:
NOTE
• Minimum rigidity of 40 Shore D (to DIN 53505 or ISO 868);
• External diameter corresponding to DIN 73378 (max. permissible deviation ± 0.1 mm
• Without burr, cut at right-angles and with undamaged circumference;
• Without burr, cut at right-angles and with undamaged
Dismantling the plug-in connections
To release the line, press in the pressure ring and pull out the hose line.

Measures to be taken before putting into service

Check all connections, voltages and the operational pressure!
Ensure that the max. operational conditions (see rating plate) will not be exceeded!
Check that Ports 1, 3 and 5 are correctly connected according to the regulations. These connections
must not be interchanged for any reason!
When operating electrically, unlock the manual override!
14 - 6510/6511
from nominal dimension);

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

6511

Table des Matières