User Maintenance; Design; Installation And Commissioning; Installation - Installation / Suspension Points - Helios ALB EC 30/20 EH Notice De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Instructions
EN
DE
CHAPTER 5

USER MAINTENANCE

m
ATTENTION
CHAPTER 6
INSTALLATION AND
COMMISSIONING
m
WARNING
nm
m
ATTENTION
Fresh Air Boxes – ALB EC
5 .0
User maintenance
There is no user maintenance.
All necessary maintenance work and cleaning should only be carried out by a qualified electrician .
All of the following information and instructions are only intended for an authorised
qualified electrician!
6 .0

Design

Air vents
Terminal box
6 .1
Installation – installation / suspension points
m WARNING
The heavy cover can knock into you or crush your fingers!
Wear safety gloves, do not stand in the opening area of the cover when opening!
The unit is delivered as a complete unit as standard, i.e. ready for connection.
After the removal of packaging and the start of installation, the following points must be checked:
– is there any transport damage,
– broken or bent parts
– Free movement of impeller
– The unit is fastened via four L-shape installation profiles, which are connected to the unit casing. The unit can be
installed in all positions permitted in Fig. 2. Ensure good accessibility for filter changes/replacement and service.
– The unit can be directly installed in the duct/piping. If required, the structure-borne sound transmission can be coun-
teracted by using vibration dampers and canvas connection pieces (see accessories).
– There is a sufficiently long, straight section of pipe (500 mm) before and after the unit to prevent performance reduc-
tion and an increase in sound.
– The casing must not be deformed or warped during installation, the unit must only be installed on sufficiently solid
and stable subsurfaces with suitable fastening materials (weight specifications on the ventilation unit).
– Sufficient backflow depending on the fan used must be ensured! If applicable, observe instructions in DIN 1946-6.
When installing under suspended ceilings, there must be an inspection flap in the size of the casing cover .
10
Fig .1
Intake fitting

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Alb ec 40/20 wwAlb ec 50/30 wwAlb ec 60/35 wwAlb ec 80/50 ww

Table des Matières