Table Des Matières - Promise Technology VTRAK 15100 Guide De Démarrage Rapide

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

VTrak 15100 Installation Task List
VTrak installation and setup consists of the following steps:
1.
Unpack the VTrak (below)
2.
3.
4.
5.
6.
7.
8.
Set IP Address with the Command Line Utility (page 13)
9.
10. Configure VTrak with WebPAM PRO (page 25)
Step 1: Unpack the VTrak
The VTrak box contains the following items:
VTrak 15100 Unit
Quick Start Guide
Null Modem Cable
(2) SCSI Terminators
Left and right mounting rails
There is a risk of explosion if the battery is replaced by the
incorrect type.
Dispose of used batteries according to the instructions that
accompany the battery.
(2) 1.0m External VHDCI SCSI cables
(64) Screws for disk drives (4 spares)
(2) 1.5m Power cords
CD with WebPAM Software, User Manual
and Quick Start Guide
Caution
3
Step 1: Unpack the VTrak

Publicité

Table des Matières
loading

Table des Matières