Télécharger Imprimer la page

Instructions For Installation - Dru PACO Instructions D'installation Et Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

Mantel Iron
An iron mantel is available by order from your installer.
A mantel serves to support the brickwork above the fire-
place, enabling the stress-free installation of the appliance.
There are two ways of building the fire into the chimney
breast.
1. Outset, i.e. the front is proud of the chimney breast
(figures 3 and 5).
Mount the chimney breast rebates provided in the outset
kit to the fire with self-tapping screws as shown in fig. 2.
If you use sheet material such as Promatec to build a
chimney breast, make sure that there is at least 20 mm
clearance between the sheet material and the bottom of
the appliance.
Use an iron mantel (15) if you are building a brickwork
chimney breast (fig. 5b).
Be aware! It is very important that you have a minimal
opening of 64 mm which is specified in figure 38c-1148 in
the beginning of this manual.
Shorten the iron mantel to the required length and lay it
on the brickwork.
Allow a space of 5 mm between the top of the frame and
the bottom of the iron mantel so that the supplied
packingcord seals properly.
Fix the threaded rod provided onto the corner of the
iron mantel with two nuts (16). Remove the hook with
the right-handed thread from the tightening screw (17)
and screw in the threaded rod. Fix the tightening screw
(17) with the hook (18) to the eye (19) to the other side.
Fix the eye to the wall with a rawlplug. Level it all using
the tightening screw.
Once the front is fitted, the chimney breast will no longer
be visible.
2. Recessed, i.e. the front is inside the chimney breast
(figures 4 and 6).
Use an iron mantel (15) if you are building a brickwork
chimney breast (fig. 6b).
Shorten the iron mantel to the required length and lay it
on the brickwork.
Make sure there is a space of at least 5 mm all round the
frame.
Fix the threaded rod provided onto the corner of the
iron mantel with two nuts (16). Remove the hook with the
right-handed thread from the tightening screw (17) and
screw in the threaded rod. Fix the tightening screw
(17) with the hook (18) to the eye (19) to the other side.
Fix the eye to the wall with a rawlplug. Level it all using
the tightening screw.
Then finish the chimney breast (e.g. plaster, paint or paper it).
Make sure that the insulation material on top of the appli-
ance does not get wet during plastering or covered with
wallpaper paste. Once the chimney breast has been finis-
hed, fit the cover plates (12 and 13) using the self-tapping
screws (14) provided.

INSTRUCTIONS FOR INSTALLATION

9
Paco

Publicité

loading