Scope Of Delivery; Dimensions; Installation Example; Preparing Electrical Connection - Franke AQUA102 Notice De Montage Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
7.

Scope of Delivery

Quantity
1
1
1
1
1
8.

Dimensions

9.

Installation Example

10. Preparing Electrical Connection

Materials required
To be provided by the customer:
• Conduit for system cabels
• Damp-room junction box (≥100 mm × ≥100 mm)
Accessories
Function controller
with Ethernet connection (60 W)
ECC1 . . . . . . . . . . . . . . . . . . . . . . . . . 2000100368
ECC2 . . . . . . . . . . . . . . . . . . . . . . . . . 2000108123
System cable
blue, 100 m . . . . . . . . . . . . . . . . . . . . 2000104272
blue, 25 m . . . . . . . . . . . . . . . . . . . . . 2000104274
gray, not halogen-free, 100 m . . . . . . 2000100801
gray, not halogen-free, 25 m . . . . . . . 2000100852
Terminating resistor . . . . . . . . . . . . . . . 2000100847
Warning!
• Operate the product only with safety extra low voltage (SELV). Do not earth the
components.
• The power supply (ECC function controller, not included in the scope of delivery,
see accessories) must be set up outside of the wet area, in a separate room.
Failure to observe can mean risk of death or material damage, e. g. from electric
shock or fire.
10.1 Install one damp-room junction box (a) for each fitting.
10.2 Lay the system cable (b) through the conduit, and loop it from fitting to fitting.
Let the system cable hang out of the damp-room junction box approx. 50 cm.
6
Description
PROTRONIC-C pillar tap with non-return valves and filters
Cleaning clip
Electric T-junction
Fastening set
Installation and Operating Instructions
Order No.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aqua10320001011612000101162

Table des Matières