Operation; Preparing The Machine For First Use; Installing The Axle And Wheels - Wacker Neuson HI400HD D Notice D'emploi

Masquer les pouces Voir aussi pour HI400HD D:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

HI400HD D / HD G
4

Operation

4.1

Preparing the Machine for First Use

1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2

Installing the Axle and Wheels

Overview
The axle and wheels are shipped loose with the machine and must be installed by
the customer.
Procedure
Perform the procedure below to install the axle and wheels.
1. Lift the machine using appropriate lifting gear.
WARNING
Crushing hazard.
► Refer to chapter Lifting the Machine for instructions on proper lifting techniques.
2. Slide the axle (a) into the tube (b) beneath the trailer.
c
d
e
3. Place a wheel (c) and flat washer (d) on each end of the axle as shown.
4. Insert hitch pins (e) into the holes at each end of the axle to secure the wheels.
ghi_tx001462gb_FM10.fm
a
b
wc_gr007904
27
Operation

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Hi400hd g

Table des Matières