Rear View - EdilKamin MITO IDRO Installation, Usage Et Maintenance

Masquer les pouces Voir aussi pour MITO IDRO:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 60
fi g. 4

REAR VIEW

B
F
fi g. 5
fi g. 6
M
COVERING INSTALLATION
D
D
D
G
M
Fig. 4
Attach the upper horizontal ceramic element (F) to the upper
grille (B) using the two M4 knurled bolts and washers provided.
Fig. 5
Insert the side ceramic panels (D) into the relevant guides.
N.B.
In the event of vibration, an 8x1 adhesive gasket is provided
to place between the profi les and ceramic side panels.
Fig. 6
Place the ceramic top (G) above the structure.
NB: it the ceramic top does not t evenly over the structure,
use the rubber stoppers (M) and washers provided, inser-
ting them into the housings on the cast iron top.
- 45
-

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières