EdilKamin IDROSALLY Installation, Usage Et Maintenance page 46

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 62
fi g. 4
G
fi g. 5
D
G
fi g. 6
COVERING INSTALLATION
G1
F
F1
C
Fig. 4
Fit the fastening springs (G1) on the back of the lower ceramic
front piece (G) using the holes and 4 M4 screws provided.
Note: the springs must be mounted with the strike plate facing
outwards as detailed in Figure 4.
Fig. 5
Fit the lower ceramic front piece (G), complete with springs
(G1) onto the pins on the metal front (D)
Fig. 6
Mount the vertical elements (F-F1), complete with the metal
frame brackets (C) previously removed from the stove, on the
structure.
- 46
-

Publicité

Table des Matières
loading

Table des Matières