Franke AQCT0005 Notice De Montage Et De Mise En Service page 7

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
11.1 Only for water connection from the rear: Install the connection bracket (a) leak-tight.
11.2 Screw in the water volume regulator (b) leak-tight.
11.3 Align the water volume regulator so that the locking screw and operating element
are freely accessible.
11.4 For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.14 m to 2.34 m from the upper edge of the finished floor.
11.5 Drill holes in accordance with these markings.
11.6 Insert the dowels.
11.7 Screw on the suspension rail.
11.8 Suspend the shower panel.
11.9 Mark the remaining drill holes.
11.10 Remove the shower panel.
11.11 Drill holes in accordance with these markings.
Insert the dowels.
The battery compartment or power supply and extension cable are not part of the
scope of delivery (see Accessories,
If you are using a wall-mounted power supply unit, it must be installed around 3 m
away from the shower.
11.12 Connect the AQUACONTACT sensor (d) with
– a battery compartment (e)
or
– a wall-mounted power supply unit (f).
If the battery charge state is low, the LED flashes in a 20s cycle.
11.13 Remove the protective film from the shower panel.
11.14 Seal the shower panel (e.g. with Chromol, not part of the scope of delivery, see
Accessories,
Chapter
11.15 Only for water connection from the rear: Prioritise work steps 11.17 to 11.19.
11.16 Mount the shower panel on the suspension rail and screw tight.
11.17 Establish the water connection.
11.18 Open the water volume regulator using a hexagonal wrench.
g: closed
h: open
11.19 Check the water connection for leaks.
Chapter
23).
- 7 -
23).

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aqct000676129821817267612982181733

Table des Matières