Install Chimney Covers; Complete Installation And Check Operation - KitchenAid LI3ZBE Instructions D'installation Et Guide D'utilisation Et D'entretien

Hotte de cuisinière stylisée de type commercial, à montage mural - 36" (91,4 cm) et 48" (121,9 cm)
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Install Chimney Covers

1. If it is not already installed, install damper on top of the
exhaust opening. Check that the damper opens freely.
2. Connect the vent system and seal all connections with
clamps.
Install Upper Chimney Cover
1. Slightly spread the sides of the cover apart and hook them
behind the chimney mounting brackets.
2. Attach the cover to the brackets with two flat head screws.
3. Securely tighten screws.
A
A. Two flat head screws
Install Lower Chimney Cover
1. Slightly spread the sides of the cover apart and hook them
behind the upper chimney.
2. Secure the lower chimney covers to the range hood canopy
using four 4.2 x 8 mm screws.
A. Lower chimney covers
B. Range hood canopy
C. Four 4.2 x 8 mm screws
Complete Installation and Check
1. Install grease filters. See the "Range Hood Care" section.
2. Check operation of the range hood blower and lights. See
the "Range Hood Use" section.
A
G
F
A. Halogen lights
B. Blower control switches
C. Halogen light switch
3. If range hood does not operate, check to see whether a
circuit breaker has tripped or a household fuse has blown.
Disconnect power supply and check that the wiring is
correct.
NOTE: To get the most efficient use from your new range
hood, read the "Range Hood Use" section.
Operation
A
E
D. Heat lamp switch
E. Heat lamps
F. Grease filter
G. Grease filter handles
B
C
D
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

W11165202a

Table des Matières