Bosch Power Xpress Dual Bollard Instructions D'installation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

in. The bollard height will vary with the application.
CAUTION:
Read all instructions before
installing the EVSE.
WARNING: Main service power must be
off and disconnected before attempting to
install the EVSE.
WARNING: The bollard weighs 20 lb per
foot, and the bottom end is significantly
heavier than the top end. Take proper
Bosch Automotive Service Solutions Inc.
Power Xpress™ Dual Bollard Charge Station Installation Guide | 7 | en
precautions and use safe lifting practices
when lifting the bollard.
5.
Place the bollard where it is to be installed and drill
holes.
6.
Install the 3/4 in. anchor bolts in accordance with
industry standards for the type of mounting being
performed.
NOTE: Adapters may be used to attach junction
NOTE: Consult national and local codes for ap-
7.
Adjust charging cable strain relief to the following
locations.
- Top unit - 7 in. from EVSE
- Bottom unit - 24 in. from EVSE
box to stand pipe. All adapters and boxes
must be suitable for wet locations.
proved service codes.
576414 | REV. B | 28.10.2016

Publicité

Chapitres

Table des Matières
loading

Table des Matières