Télécharger Imprimer la page

Putting Into Use; Functional Check; Maintenance; Faults - Simco P-SH-N-Ex Notice D'utilisation

Publicité

Les langues disponibles

Les langues disponibles

6. Putting into use

The anti-static bar is put into operation by switching on the (mains) voltage.

7. Functional check

Warning:
 In an explosion-hazardous zone only measuring instruments suited for this zone may
be used.
The neon lamp you fitted (outside the hazardous area) gives an indication of the high voltage.
An electrostatic fieldmeter must be used to measure the efficiency of the anti-static bar.
Measure the charge on the material before and after it has passed the anti-static bar.
The charge measured should have been neutralised after the material has passed the anti-static
bar.

8. Maintenance

Warning:
When carrying out work on the equipment: De-energise the equipment.
Attention:
 Do not damage the emitter points.
 Keep the anti-static bar clean.
 If fouled: clean the anti-static bar with a hard non-metal brush.
 If heavily fouled: clean anti-static bar with isopropyl alcohol or with Veconova 10 industrial
cleaner (www.eco-nova.nl).
 Allow the anti-static bar to dry entirely, before energising again.

9. Faults

Problem
No/poor ionisation.
No high voltage on emitter
points.
Table 2: faults
P-SH-N-Ex_UM_9752031420_NL_D_GB_F_V2_0
Cause
No high voltage.
Anti-static bar is fouled.
Emitter points are covered. Remove the cover.
Emitter points are
damaged.
No (mains) voltage on the
bar.
Fuse is defective.
Transformer is defective.
Remedy
See problem: no high
voltage.
Clean anti-static bar.
Return bar for repair.
Restore (mains) voltage.
Replace the fuse.
Replace the bar.
GB
17

Publicité

loading