EWK 036 Manuel D'entretien page 45

Tours ouvertes
Table des Matières

Publicité

English – Inglés – Anglais
 
2. Rotate 45º the manhole and remove it.
3. Remove fill panels one by one;
according to the model the fill will have
a different number of panels. (fig.27).
4. Clean the fill panels with pressure
water or substitute same.
5.2.3.- Spray nozzles
a) Checking the nozzles; To be sure that the
nozzles are not clogged, it will be
sufficient to observe that the water is
falling in a uniform way in the collecting
basin. If an area is detected, in which
water is not falling in a normal way,
remove and clean the nozzles in that
area. (fig. 28).
Besides, it is possible to check the correct
performance of the nozzles, installing a
pressure gauge (see figure 1/4). The
pressure appearing in the gauge must be
equal or over 2,0 m water column.
 
 
 
Français– French –Francés
 
2. Tourner de 45º la porte et la sortir.
3. Extraire les panneaux du garnissage
un à un, selon le modèle il y aura un
numéro différent de panneaux (fig.
27).
4. Procéder
panneaux du garnissage avec de
l´eau
remplacer ceux-ci.
5.2.3.- Tuyères
a) Inspection des tuyères: Pour vérifier que
les tuyères ne se trouvent pas bouchées il
sera suffisant d´observer si l´eau tombe
uniformément dans le bassin. Si on
observe des zones où l´eau ne tombe pas
d´une
nettoyer les tuyères (fig. 28).
On peut aussi vérifier le fonctionnement
correct
manomètre (voir figure 1/4). La pression
indiquée par le manomètre doit être
supérieure ou égale à 2,0 m.c.a.
 
au
nettoyage
sous
pression
façon
normale,
démonter
de
tuyères
en
plaçant
  P ag. 44 
 
des
ou
bien
et
un

Publicité

Table des Matières
loading

Table des Matières