Use And Maintenance; Gas Conversion - Sime Rx 19 Tp Mode D'emploi

Table des Matières
4 
USE AND MAINTENANCE
4.1 
ACTIVATION AND 
SIT 820 NOVA mV 
GAS VALVE 
ADJUSTMENT (fig. 7)
-.Check.that.both.the.system.and.boi-
ler.are.full.of.water.and.fully.vented..
Remove.the.inlet.pressure.gauge.on.
the.gas.valve.(7).and.engage.a.water.
column. gauge.. Open. the. gas. cock..
Check.that.the.upstream.gas.pres-
sure. is. equal. to. or. slightly. higher.
than.20.mbar..(Attention:.if.pressure.
exceeds.37.mbar,.insert.the.pressu-
re.reducers.upstream.the.boiler.or.
boiler.room).
-.Rotate.the.control.knob.(1).to.the.pi-
lot.position..Fully.press.the.control.
knob..The.gas.will.start.leaking.from.
the. pilot.. Switch. the. pilot. on. using.
the. piezoelectric. activator.. When.
the.pilot.is.on,.wait.about.20.minutes.
before. releasing. the. control. knob..
The.pilot.will.remain.on..Otherwise,.
repeat.the.operation.
-.Rotate.the.control.knob.to.the.bur-
ner.position.
-. Remove. the. downstream. pressure.
connection. screw. on. the. valve. (8)..
Move.the.water.column.gauge.to.the.
downstream. pressure. connection..
Tighten. the. inlet. pressure. connec-
tion.screw.
-.Set.the.required.temperature.on.the.
boiler.thermostat..When.the.burner.
is.fully.on,.calibrate.the.burner.gas.
pressure. (using. adjustment. screw.
2). referring. to. the. values. indicated.
in.the.technical.data.table.(point.1.3).
according.to.the.type.of.gas.used.
-.Seal.the.performed.adjustment.
-. If. the. burner. does. not. switch. on,.
check. that. sufficient. voltage. rea-
ches.the.gas.valve.
4.3 
ADJUSTING THE GAS 
PRESSURE TO BURNERS
Pressure. calibration. and. gas. input.
are.carried.out.by.the.manufacturer..
During.installation.of.the.equipment,.
feed.pressure.might.be.different.from.
standard.values..
It. is. therefore. necessary. to. check.
pressure.and.gas.input.when.igniting.
the.boiler.for.the.first.time..
This. test. should. be. performed. with.
the.boiler.in.full.operation.(obviously.
no. other. gas. appliances. should. be.
working.at.the.same.time)..Read.the.
gas. meter. twice. every. 6. minutes..
Multiply. the. consumption. by. ten. to.
calculate.the.consumption.per.hour..
If. this. value. does. not. correspond. to.
42
KEY
. 1. Control.knob
. 2.. Burner.pressure.adjustment.screw
. 3.. Pilot.flow.rate.adjustment.screw
. 4.. Thermocouple.connection
. 7.. Power.pressure.connection
. 8.. Burner.pressure.connection
. 9.. Burner.solenoid.valve
the.one.in.point.1.3,.turn.the.screw.of.
the. pressure. regulator. on. the. valve.
until. the. exact. value. is. obtained..
Screw. slowly. and. gradually.. Read.
the.gas.meter.at.least.thirty.seconds.
after.regulating.the.pressure.
4.4 
GAS CONVERSION 
(fig. 8)
A. kit. is. supplied. complete. with. the.
necessary.change-over.materials.for.
operation. with. butane. gas. (G30). or.
propane. gas. (G31).. Operate. in. the.
following. manner. for. changing. over.
from.one.gas.to.another:
–. Replace.the.main.nozzles.and.pilot.
nozzle.supplied.in.a.kit.
–. Fully. tighten. the. gas. valve.
adjustment.screw.(2.fig..7).
–. Set. valve. input. pressure. at. 30/37.
mbar. according. to. the. type. of. gas.
by. acting. on. the. outer. pressure.
reducer.
–. When. the. working. pressures. have.
been. adjusted,. reseal. the. regula-
tors.
–. After. have. ultimated. the. conver-
sion.of.the.boiler,.please.stick.onto.
the.casing.panel.the.plate.showing.
the. relevant. feeding. gas. which. is.
included.into.the.kit.
NOTE:  After  assembling  all  the  gas 
connections, a test for gas tightness 
Fig..7

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Rx 26 tpRx 37 tpRx 48 tpRx 55 tp

Table des Matières