Table des Matières

Slope Indicator

You may copy this page for personal use.
The maximum slope you can operate the machine on is 15 degrees. Use the slope chart to determine the degree
of slope of hills before operating. Do not operate this machine on a slope greater than 15 degrees. Fold along
the appropriate line to match the recommended slope.
Align this edge with a vertical surface, a tree, building, fence pole, etc.
Example of how to compare slope with folded edge
Safety: Slope Indicator
G011841s
Page 2–2
3474-300 A
Table des Matières
loading

Ce manuel est également adapté pour:

766067660776610

Table des Matières