Maintenance And Inspection - Hitachi WH 12DM2 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
English
Bolt
Nut
For WR12DM2
For WR9DM2

MAINTENANCE AND INSPECTION

1. Inspecting the driver bit (WH12DM2, WH9DM2,
WH12DMR)
Using a broken bit or one with a worn out tip is
dangerous because the bit can slip. Replace it.
2. Inspecting the socket (WR12DM2, WR9DM2)
A worn or deformed hex. or a square-holed socket
will not give an adequate tightness to the fitting
between the nut or anvil, consequently resulting in
loss of tightening torque. Pay attention to wear of a
socket holes periodically, and replace with a new one
if needed.
17
Steel plate thickness t
kgf·cm
N·m
M16 × 55 F10T (tighening time 3 sec)
2000
200
1600
160
1200
When full recharged
120
When completely
800
80
discharged
400
40
0
0
0
20
Number of tightenings (PCS)/charging
M14 × 50 High tension bolt
kgf·cm
N·m
160
1600
120
1200
When full recharged
80
800
When completely
400
40
discharged
0
0
0
20
40
Number of tightenings (PCS)/charging
*The following bolt is used.
Ordinary bolt: Strength grade 4.8
High tensile bolt: Strength grade 12.9
(
Explanation of strength grade:
4 — Yield point of bolt: 32 kgf/mm
8 — Pulling strength of bolt: 40 kgf/mm
Fig. 27
a
40
60
80
100
120
Fig. 28
(tighening time 3 sec)
60
80
100
120
Fig. 29
3. Inspecting the mounting screws
Regularly inspect all mounting screws and ensure
that they are properly tightened. Should any of the
screws be loose, retighten them immediately. Failure
to do so may result in serious hazard.
4. Maintenance of the motor
The motor unit winding is the very "heart" of the
power tool.
Exercise due care to ensure the winding does not
become damaged and/or wet with oil or water.
140
a
140
160
)
2
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wr 12dm2Wh 12dmrWh 9dm2Wr 9dm2

Table des Matières