Connections
! IMPORTANT
Electrical connection
The insert is equipped with a three-pole cable (Fig.2), for a correct installation it is necessary to provide the dedicated electrical
connection under magneto-thermic (Fig.1) of adequate size according to the absorption of the generator in order to guarantee the
maximum safety of the installation.
Testing and commissioning
Stove start-up must be preceded by testing, which includes an operational check of the following elements:
connection to the smoke evacuation system;
•
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
•
The testing is positive only when all operational phases have been completed without any anomaly being detected.
Use and maintenance manual RBC 8010 - RBC 8012
The connections must be set up by a technician that is qualified and/or authorised by the
Manufacturer.
Fig.1
Fig.2
Rev.0 17.07.19
Page 57
EN