Green Cell 1KVAS-EBP Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9. Align the mounting brackets with the screw holes on each side of the UPS and fi x with the supplied M4×8 fl at-he-
ad screws (see FIG. 5)
10. If installing optional cabinets, repeat Step 8 and 9 for each cabinet.
11. Slide the UPS and any other optional cabinets into the rack.
12. Secure the front of the UPS to the rack using one M5×12 pan-head screws and one M5 cage nuts on each side
(see FIG. 6).Install the bottom screw on each side through the bottom hole of mounting bracket and the bottom
hole of the rail.
13. Repeat for any optional cabinets.
FIG 6: Securing the Front of the Cabinet
RACKMOUNT WIRING INSTALLATION
This section explains:
• Installing the UPS, including connecting the UPS internal batteries
• Connecting any Optional EBP (S)
Installing the UPS
NOTE Do not make unauthorized changes to the ups; otherwise, damage may occur to your equipment
and void your warranty.
NOTE Do not connect the ups power cord to utility until after installation is completed.
To install the UPS:
1. Remove the front cover of each UPS
Hold the cover part without LCD on the right side and extract it (see Fig.7)
FIG 5: Installing the Mounting Brackets
1. Mounting Bracket
2. M4x8 Flat-Head Screws
(4 places)
1. M5X12 Pan-Head
Screws (2places)
2. M5 Float Nuts
(2places)
EN / 9

Publicité

Table des Matières
loading

Table des Matières