Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

48 hours after long-term storage. If optional EBPs are installed, see the recharge times listed in Table 21. Check the
battery recharge date on the shipping carton label. If the date is expired and the batteries were never recharged, do
not use the UPS. Contact your service representative.

REPLACING BATTERIES

NOTE DO NOT DISCONNECT the batteries while the UPS is in Battery mode.
The EBP can be replaced when UPS is ON but be aware that if the utility fails at that time , the load of the
UPS may NOT be protected.
If you prefer to remove input power to change the batteries, see "UPS Turn on and Turn off".
WARNING
• Servicing should be performed by qualifi ed personel knowledgeable of batteries and required precau-
tions. Keep unauthorized personnel away from batteries.
• Batteries can present a risk of electrical shock or burn from high short circuit current. Oberve the follo-
wing precaution: 1. Remove watches, rings, or other metal objects; 2. Use tools with insulated handles;
3. Do not lay tools or metal parts on top of batteries; 4. Wear rubber gloves and boots.
• When replacing batteries, replace with the same type and number of batteries or battery packs. Contact
your service reoresentative to order new batteries.
• Proper disposal of batteries is required. Refer to your local codes for disposal requirements.
• Never dispose of batteries in a fi re. Batteries may explode when exposed to fl ame.
REPLACING RT UPS AND EBPS
1. If the battery fault, the following steps are provided for modular unit to replace the new battery pack
2. Remove the front cover of the battery box.
3. Remove the connection cables between battery box and UPS. Release the screw of the baffl e of the battery pack
as the Fig.25 shows, then remove the baffl e from the left or right.
4. Grasp the handle in front of the battery pack, take out of it and hold it, then remove the battery pack as fi g. 26
shown.
5. Hold the middle of the new battery pack, insert it. Once install the new battery pack, make sure it is completely
inserted into the chassis as fi g 27 shown.
TESTING NEW BATTERIES
To test new batteries:
1. Plug the UPS into a power outlet for 48 hours to charge the batteries.
2. Start up the UPS by pressing the start up combination button.
3. Press the battery test combination button to activate the battery test.
The UPS starts a battery test if the batteries are fully charged, the UPS is in Normal mode with no active alarms,
and the bypass voltage is acceptable. During the battery test, the UPS transfers to Battery mode and discharges the
batteries for 10 seconds. The LED indicators of the front cover stop cycling when the test is completed.
RECYCLING THE USED BATTERY OR UPS
Contact your local recycling or hazardous waste center for information on proper disposal of the used
battery or UPS.
WARNING
Do not dispose of the battery or batteries in a fi re. Batteries may explode. Proper disposal of batteries
is required. Refer to your local codes for disposal requirements.
Do not open or mutilate the battery or batteries. Released electrolyte is harmful to the skin and eyes. It
may be toxic.
CAUTION: Do not discard the UPS or the UPS batteries in the trash. This product contains sealed,lead‐acid
batteries and must be disposed properly. For more information, contact your local recycling/reuse or
hazardous waste center
CAUTION: Do not discard waste electrical or electronic equipment (WEEE) in the trash. For proper dispo-
sal, contact your local recycling/reuse or hazardous waste center.
26 / EN

Publicité

Table des Matières
loading

Table des Matières