Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RACKMOUNT SETUP

CAUTION
The cabinet is heavy. Removing the cabinet from its carton requires a minimum of two people.
If installing optional EBP (S), make sure to install the EBP (S) directly below the UPS so that all wiring
between the cabinets is installed behind the front covers and inaccessible to users.
NOTE Mounting rails are required for each individual cabinet
TO INSTALL THE RAIL KIT:
1. Assemble the left and right rails to the rear rails as shown in FIG.3.Do not tighten the screws.
Adjust each rail size for the depth of your rack.
2. Select the proper size in the rack for positioning the UPS (see FIG. 4). The rail occupies four positions on the front
and rear of the rack.
3. Tighten four M5 Umbrella Nuts in the side of rail assembly (see FIG. 3).
4. Fix one rail assembly to the front of the rack with one M5×12 pan-head screw and one M5 cage nut. Using two M5
cage nuts and two M5×12 pan-head screws, to fi x the rail assembly to the rear of the rack.
5. Repeat Steps 3 and 4 for the other rail assembly.
6. Tighten the four butterfl y nuts in the middle of each rail assembly.
7. If installing optional cabinets, repeat Step 1 through Step 6 for each rail kit.
8. Place the UPS on a fl at, stable surface with the front of the cabinet facing to you.
8 / EN
FIG 3: Securing the Rails
FIG 4: Fixing the Rails
1. Real Rails
2. M5 Butterfl y Nuts (8 places)
3. Left Rail
4. Right Rail
1. Front of Rack
2. M5x12 Pan-Head
Screws (8 places)
3. M5 Float nuts (8 places)
4. Tighten adjustment nuts
after rail attachment (4
places each rail.)

Publicité

Table des Matières
loading

Table des Matières