Recommended Donning Procedures For The Tychem ® Tk. Gas-Tight Suit - DuPont Tychem TK Manuel D'utilisation

Vêtements étanches aux gaz
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Recommended donning
procedures for the Tychem
gas-tight suit
Donning the Tychem
ter although it will be necessary for a dresser to assist the
wearer in the donning procedure.
1. Unzip the suit by pulling approximately 61cm (24") at a time
keeping the zip straight with one hand as you pull the slider
with the other. Repeat this exercise for the whole length of the
zip. FAILURE TO FOLLOW THIS PROCEDURE MAY RESULT IN
THE ZIP BECOMING JAMMED .
2. Roll up the outer legs approximately 20-23 cms (8"-9") and fold
down the suit to expose the top of the integral boot socks. The
wearer should step into the integral socks and then into a pair
of safety boots. Next roll the outer legs down over the exterior
of the safety boots and with the aid of the dresser lift the suit
Figure 7
12
TK. gas-tight suit is a very simple mat-
®
Figure 8
®
TK.

Publicité

Table des Matières
loading

Produits Connexes pour DuPont Tychem TK

Table des Matières