Télécharger Imprimer la page

Kohler Prim R706534-8L-SHP Guide D'installation page 12

Porte coulissante de douche et de baignoire

Publicité

Les langues disponibles

Les langues disponibles

9. Prepare the Wall Bracket Holes
IMPORTANT! Hole locations for the wall brackets are critical. Make sure the holes are properly marked
and drilled straight into the wall.
Make sure the top of the wall jamb is secured in place with masking tape.
Place the drill template over the wall jamb, pointing into the shower as shown.
Verify that the template is fully seated over the wall jamb, flat against the wall, and level.
Mark the hole locations.
Remove the template and drill 1/4" holes straight into the wall at the marked locations. Make sure
the drill is not at an angle when drilling.
Install the provided wall anchors. Make sure the anchors are fully seated into the wall.
Repeat for the second wall jamb.
1380408-2-B
All manuals and user guides at all-guides.com
12
1/4"
Kohler Co.

Publicité

loading