ABB Steel City RPT6 Serie Instructions D'installation
Masquer les pouces Voir aussi pour Steel City RPT6 Serie:
Les langues disponibles

Les langues disponibles

Liens rapides

1 of 24 - ENGLISH
I N STA LL ATI ON INSTR UC TI O N S - EN G L I S H
Recessed Poke-Throughs, RPT6 series
RPT6-3G-ALM, RPT6-3G-BLK, & RPT6-3G-BRS
CAUTION:
• Floor box should be installed by a qualified
electrician in accordance with national and local
electrical codes.
Table of Contents:
1.0 Important Notes ..................................................................................................... 1
2.0 Layout and location of hole ..................................................................................2
3.0 Drill hole in floor ......................................................................................................2
4.0 Configure junction box for installation ..............................................................2
5.0 Electrical Devices ....................................................................................................3
5.1 IMPORTANT! Select Electrical Devices (Receptacles) to fit
Poke-Through
5.2 Install Electrical Devices
6.0 Install Poke-Through body into hole ...................................................................5
7.0 Install data devices .................................................................................................6
8.0 Electrical connections to junction box...............................................................7
9.0 Cover assembly .......................................................................................................8
10.0 RPT6 Optional available parts ............................................................................8
Part List: (parts furnished)
A. RPT6-CVR-XXX Cover
B. RPT6 Poke-Through Body complete with Junction Box
C. Accessories
(2) Side Device Cover Plates
(1) Center Device Cover Plate
(3) Duplex Insert Plates
(1) Power Wiring Tunnel for Junction Box
(2) Side Bottom Cover for Junction Box 1/2" to 3/4" knockout
(1) Center Bottom Cover for Junction Box 1/2" to 3/4" knockout
(1) 2 - Compartment Bottom Cover for Junction Box 11/4" through hole,
11/2" to 2" knockout
A
B
Figure 1
C
Important
Read and understand all instructions and
safety information before use. Be aware
of proper usage and potential hazards.
WARNING:
• Risk of shock, disconnect power before installation.
1.0 Important notes:
1.1 See product category "Outlet boxes and fittings" classified for fire
resistance in the current "Underwriters Laboratories, Inc." "Fire Resistance
Directory" for the fire resistance classification of the Steel City® Poke-
Through System. Suitable for use in air handling spaces in accordance with
the National Electrical Code.
1.2 Poke-Through floor fitting (Base Unit) is only to be used with a Steel City®
cover listed for use with this unit. The system is designed to maintain the
hourly rating of concrete floors having a fire rating of 1, 11/2 and 2 hours,
only when installed in accordance with these instructions.
1.3 To maintain fire resistance classification rating, a complete Steel City®
Poke-Through including the Poke-Through Body and Poke-Through Cover
must be installed.
1.4 Concrete thickness Min/Max:
• 1-HOUR RATED FLOOR: 21/4" min over top of deck (or 3" thick reinforced
concrete slab) to a maximum of 71/2".
• 2-HOUR RATED FLOOR: 31/4" min over top of deck (or 4" thick reinforced
concrete slab) to a maximum of 71/2".
1.5 Spacing: Minimum of 2 ft. on center and not more than one device per 65
sq. ft. of floor area in each span.
1.6 Installation: Mount in a 6" diameter core-drilled hole in accordance with
these instructions.
1.7 Floor coverings: When installed in accordance with these instructions, this
Poke-Through is fire rated for carpet and wood covered concrete floors,
tile floor coverings up to 3/4" maximum thickness, and linoleum floor
coverings up to 1/8" thickness. Poke-Through may be installed directly on
concrete floor when no floor covering is planned.
1.8 Maximum allowable copper conductors in Side channels and Center
channel:
Side
Center
channel
channel
Maximum
0.01920
0.01920
cross
sq. in.
sq. in
sectional
area of
copper in
each
channel
Side
Copper cross sectional area of
commonly used conductors
channel
0.01920
Size AWG
Solid or Stranded (sq. in.)
sq. in
#24
#23
#22
#14
#12
#10
#8
0.00032
0.00040
0.00050
0.00323
0.00512
0.00815
0.01296
Table des Matières
loading

Sommaire des Matières pour ABB Steel City RPT6 Serie

  • Page 9: Table Des Matières

    9 de 24 - FRANÇAIS — F E U I LLE D’INST R UCT I ON - F R A N ÇA I S Boîtes de sol encastrées, série RPT6 RPT6-3G-ALM, RPT6-3G-BLK, & RPT-3G-BRS Important Prenez le temps de lire et comprendre l’ensemble des instructions et des renseignements de sécurité...
  • Page 10: Tracé Et Emplacement Des Trous

    10 de 24 - FRANÇAIS 2.0 Tracé et emplacement des trous : Service mixte Laisser les deux diviseurs bien fixés à l’intérieur de la boîte de jonction. Chaque 2.1 Voir ESPACEMENT à l’étape 1.5. groupe sera alimenté par un compartiment de la boîte de jonction. Un REMARQUE : Assurez-vous de percer les trous à...
  • Page 11: Appareils Électriques

    11 de 24 - FRANÇAIS Service mixte Retirer toutes les oreilles latérales pour les Retirer 1 diviseur de la boîte de jonction pour joindre 2 compartiments. Un groupes latéraux et le groupe central branchement de conduit est nécessaire pour le compartiment réservé à l’électricité.
  • Page 12: Installer Les Appareils Électriques

    12 de 24 - FRANÇAIS 5.2 Installer les appareils électriques : Vis de montage Les appareils électriques peuvent être installés AVANT ou APRÈS l’insertion de la boîte de sol dans le trou. La figure 13 illustre l’installation des appareils électriques AVANT l’insertion de la boîte de sol dans le trou. À des fins d’illustration, la figure 13 présente 2 groupes utilisant des appareils électriques.
  • Page 13: Installer Le Boîtier De La Boîte Encastrable Dans Le Trou

    13 de 24 - FRANÇAIS 6.0 Installer la boîte encastrable dans le trou : 6.1 La boîte encastrable ne peut plus être pivotée une fois insérée dans le trou. Vérifier que les trois groupes sont placés dans la direction voulue avant d’insérer la boîte dans le trou.
  • Page 14 14 de 24 - FRANÇAIS 7.0 Installer tous les dispositifs de données : Les appareils de données peuvent être installés AVANT ou APRÈS l’insertion de la Vis de montage boîte encastrable dans le trou. Plaque pour À des fins d’illustration, on montre ici le câblage de données installé APRÈS appareil latérale l’insertion.
  • Page 15: Branchement Électrique À La Boîte De Jonction

    15 de 24 - FRANÇAIS 8.0 BRANCHEMENTS ÉLECTRIQUES À LA BOÎTE DE JONCTION : Consulter la SECTION 4.0 et veiller à ce que la boîte de jonction soit configurée pour l’installation choisie. LA BOÎTE DE JONCTION DOIT ÊTRE CONFIGURÉE avant de passer au point 8.0.