Télécharger Imprimer la page

ABB Steel City RPT6 Serie Instructions D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

2 of 24 - ENGLISH
2.0 Layout and location of hole:
2.1 See SPACING in Step 1.5.
NOTE: Drill the holes at least 6" away from any wall or pillar allowing
enough room for the installation of the Poke-Through and Cover.
24" minimum
Center to Center
Figure 2
3.0 Drill hole in floor:
3.1 Install or cut hole from Carpet, Wood, Tile or Linoleum Floor. Use template
provided with cover instructions. (Poke-Through may be installed directly
on concrete floor if no finished floor is planned).
3.2 Core Drill a 6" Diameter Hole. Actual hole size may be up to 61/8" diameter
due to drill bit and job site construction tolerance (see Figure 3).
Finished Floor, see step 3.1
Poke-Through may be
installed directly on
concrete floor
Figure 3
4.0 Configure junction box for installation:
Recommended: Configure junction box for dual service or single service
before inserting the poke-through into hole.
Important: Power and data wires must be separated by a voltage divider.
Select a CONFIGURATION that will meet the installation requirements.
4.1 Remove the Bottom (3) Junction Box Covers from the bottom of the
Junction Box by removing the (6) screws holding the Covers (see Figure 4).
4.2 Select from (4) possible junction box configurations: See Figures 5, 6, 7,
and 8. NOTE: There are (3) (12 AWG) ground wires in the Junction Box.
Leave the ground wires in place. Use a (10 AWG) ground wire if 30A device
is used, see Step 5.1.3.
4.3 Replace the bottom (3) Junction Box Covers (see Figure 4)
Junction Box
Figure 4
Concrete, see step 3.2
(6) Screws
Junction Box Covers
Dual Service
Leave both dividers secured inside the Junction Box. Each gang will be
serviced by a Junction Box compartment. A conduit connection is required
at each compartment when power is fed through. Use any of the (3)
Compartments for Power or Data.
(2) Dividers
Side
Compartment
Power or Data
Ground
Wire
Figure 5
Dual Service WITH wiring tunnel added.
Break-off one knockout of each divider as shown. Insert power wiring
tunnel into the bottom of the Junction Box. Use the (2) Side
Compartments for Power and Center Gang for Data.
(2) Dividers
Knockouts
See
Detail A
Side
Compartment
Power
Figure 6
Ground Wire
Side
Compartment
Power or Data
Ground
Wire
Center Compartment
Power or Data
Wiring Tunnel
Remove
Detail A
(2) Dividers
(3) Ground Wire
Side Compartment Power
Center Compartment Data
Replace (3) Junction Box
Covers, keeping wiring tunnel
in place.

Publicité

loading