Télécharger Imprimer la page

ABB Steel City RPT6 Serie Instructions D'installation page 5

Publicité

Les langues disponibles

Les langues disponibles

6.0 Install Poke-through body into hole:
6.1 Poke-through cannot be rotated after insertion into hole. Verify that
3-Gangs are in desired orientation before insertion (See Figure 14).
6.2 IMPORTANT! If flexible conduit is used, electrical connections can be made
before inserting Poke-Through into hole. Flexible conduit MUST be
connected to bottom of Junction Box (See Figure 15).
6.3 Insert Poke-Through into hole and push down until TOP RIM contacts the
concrete floor. (See Figure 16).
CAUTION:
• Poke-Through cannot be rotated after insertion into
the hole. Verify the three gangs are in the desired
orientation before inserting the unit into the hole.
Figure 14
IMPORTANT, see step 6.1
Figure 15
Three Gangs
Figure 16
5 of 24 - ENGLISH
Top of Rim
Carpet, Wood,
Tile or Linoleum
Floor
Top of Concrete
Floor

Publicité

loading