Masquer les pouces Voir aussi pour Crea Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

The following information has been included in the manual as safety and regulatory guidelines.
For complete installation instructions, please see the Installation Checklist.
Installer Safety
•In all areas of the world, equipment should be installed in accordance with existing local codes.
Please contact your local authorities if you have any questions.
•Care should be taken to ensure that all basic safety practices are followed during the installation
and servicing activities related to the installation and service of equipment.
•Only authorized personnel should perform installation and repairs on the equipment.
•Authorized service personnel should consult OSHA Standard 29CFRI910.147 or the applicable
code of the local area for the industry standards on lockout/tagout procedures before
beginning any installation or repairs.
•Authorized service personnel must ensure that the proper PPE is available and worn when
required during installation and service.
•Authorized service personnel must remove all metal jewellery, rings, and watches before
working on electrical equipment.
•The main power supply(s) to the freezer must be disconnected prior to performing any repairs.
Failure to follow this instruction may result in personal injury or death from electrical shock or
hazardous moving parts as well as poor performance or damage to the equipment.
Site Preparation
•Review the area the unit is to be installed in before uncrating the unit, making sure that all
possible hazards the user or equipment may come into have been addressed.
•This unit must NOT be installed in an area where a water jet or hose can be used. NEVER use a
water jet or hose to rinse or clean the unit. Failure to follow this instruction may result in
electrocution.
•This unit must be installed on a level surface to avoid the hazard of tipping. Extreme care should
be taken in moving this equipment for any reason.
Electrical Hook-Up Installation For 60 Cycles, 1 Phase, Supplied With Cord and Plug.
•This equipment is supplied with a 3- wire cord and grounding type plug for connection to a
single phase, 60 cycle, branch circuit supply. This unit must be plugged into a properly
grounded receptacle.
•Check the data label, located on the back panel, for electrical specifications.
•Permanent wiring may be employed if required by local codes. Instructions for conversion to
permanent wiring are as follows:
1. Be sure the machine is electrically disconnected.
2.Remove the appropriate panel and locate the electrical connection where the supply cord is
connected.
3.Remove the connection tabs and the strain relief hook. Remove the factory- installed cord.
4.Route incoming permanent wiring through the hole and a conduit in order to avoid any
folding.
5.Install the field-wiring terminals and connect to them the power supply leads. Connect two
power supply leads. Attach ground (earth) wire to the grounding lug inside.
6.Be sure the unit is properly grounded before applying power.
FOLLOW YOUR LOCAL ELECTRICAL CODES!

IMPORTANT:

This Ice Cream Machine contains its own refrigerant which must be allowed to settle after
transport. Leave the Ice Cream Machine on a horizontal surface for at least 12 hours after
purchase or after any move which might have stored the machine the wrong way up.
Leave at least 20 cm on each side of the machine to allow free air circulation. Make sure the vent
slots are free and unobstructed.
English
 
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Crea gelato 6k

Table des Matières