Télécharger Imprimer la page

LEGRAND Keor Hp Serie Installation Et Démarrage page 18

Masquer les pouces Voir aussi pour Keor Hp Serie:

Publicité

Les langues disponibles

Les langues disponibles

3.2
HANDLING OF THE UPS
The UPS is packed on a pallet. It is handled from the transport vehicle to the installation (or
storage) place via a fork lift.
The device has a heavy weight
 Avoid turnover during the transport of the UPS.
 Cabinets must always be handled in upright position.
 During loading and unloading operations, always respect the indications
regarding the device barycentre marked on the package.
To handle the UPS remove the lower front and rear panel and insert the forks of a fork lift.
Picture 2 – Handling of UPS KEOR HP
18
OMD36055 REV. D
Installation and start-up of UPS Keor Hp 200-300kVA
Installation et démarrage de l'UPS Keor Hp 200-300 kVA
Installazione e avviamento UPS Keor Hp 200-300kVA

Publicité

loading

Ce manuel est également adapté pour:

Keor hp 200kvaKeor hp 250kvaKeor hp 300kva