Pre-Commissioning Check; Commissioning; Functions Of The Production Switch - Wessamat W20 W Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NOTE: Check again the dimensions of the ice cube maker and the installation slot.
5.2.1 Please fix the drain coupling (2) at the slide-in tray (1) and insert the tray into the installation slot (see
installation instruction for slide-in tray).
5.2.2 Cut the enclosed outlet hose (3; DN 20) as you needed and fix it with the drain coupling (2) at the slide-in
tray also with the enclosed plastic angle (4). Then link it with the local water connection and lay it towards the
local drain (see Fig. 5.2.b).
It is important that the hose always has an incline and shows no bents. If the drain is not sufficiently
inclined or is bent, the storage bin can overfill with water which could cause water damage. For positioning in
narrow bows, please use a custom-sized plastic angle (e.g. 4).
CAUTION: For hygienic reasons, the outlet hose must not be connected directly to the waste water
system (see Fig. 5.2.b).
5.2.3 Position machine in front of installation slot. Demount front panel (5 – see installation instruction for front
metal sheet) and remove lateral flap (6) in the casing.
5.2.4 Please connect the inlet hose (Ø= 10 mm) with the water tab (cold water-/ fresh water inlet), see
installation instruction for water inlet!
E
N
CAUTION: Connect to drinking water only!
G
L
5.2.5 Plug in the mains plug and open the water supply (water-shut-off valve). Check waterproofing of all water
I
connections of supply and drain.
S
C
5.2.6 Fill the storage bin with about 2 litres of drinking water and check the drain for tightness.
H
5.2.7 Mount front metal sheet. Please make sure that the production switch (see Fig. 5.5) is turned to the right.
E
N
5.2.8 Put the machine on the guide bar of the slide-in tray and push it backwards (see installation instruction for
G
slide-in tray).
L
I

5.3 Pre-commissioning check

S
Prior to first commissioning and after prolonged periods of non-operation (e.g. holiday or transport) the ice cube
H
maker should be cleaned (see chapter 7.1), and checked and its proper function testified by a specialist.
A
N

5.4 Commissioning

G
Push the production switch, located on the upper side inside the storage bin, to the left. Ice cube production
L
starts automatically and the storage bin is enlighten by blue LED's.
A
I

5.5 Functions of the production switch

S
The production switch fulfils several functions, which are relevant for
operation and also for service, interruptions to operation and for
cleaning. The individual functions can be taken from the following
description:
Push switch to the left: Production on
Setting the production switch to the left, starts ice cube production
automatically (if the power plug is inserted). The ice cube maker
generates ice cubes until the storage container is full. The level of ice
cubes in the container is automatically regulated by means of a
thermostat. When the maximum filling level is reached in the storage
container, ice cube production ends automatically and starts again
automatically after the desired number of ice cubes have been removed.
Middle switch : Service
This position of the production switch allows the position of the ice cube water trough to be varied. This switch
position is only needed by trained service personnel in order to carry out maintenance and repair work.
The switch position is without significance for operation of the ice cube maker (start or interruption of ice cube
production) and for routine cleaning by the operator.
Push switch to the right: Production off
Fig. 5.5: Production switch, located on
the upper side inside the storage bin
24

Publicité

Chapitres

Table des Matières
loading

Table des Matières