Assemblage De La Tête De Rotor - a2pro Apache Excellium 480 Serie Notice De Montage

Table des Matières

Publicité

Assemblage de la tête de rotor
Screw the main rotor hub and the flybar pivot together. Do not overtighten the screws,
this will damage the flybar pivot (808631). Just flip the mixing levers (808633) to get
acces to the screws heads. Put the brass bush (808632) inside the ball bearing (808020)
prior to mount it on the flybar pivot (808631).
The « A » pushrods between the mixing levers and the blade grips are 25mm long.
Screw the 808647 plastic ball links on the 808646 rod until they flush. Please take care
to plug the 808647 on the balls using the widest side of the hole
to plug the 808647 on the balls using the widest side of the hole.
Commencez par l'assemblage du pivot de barre de Bell sur le hub de rotor
principal. Attention à serrer les vis 808917 modérément pour ne pas endommager
le filet de la pièce 808631 (Pivot de barre de Bell). Pour visser le pivot sur le hub
principal, il faut faire pivoter les leviers de mixage 808633 pour dégager l'accès
nécessaire. Installer l'insert en laiton 808632 dans le roulement 808020 avant de le
monter dans le pivot de barre de Bell (808631).
monter dans le pivot de barre de Bell (808631)
Les tringleries allant des leviers de mixage vers les pieds de pales (tringleries A)
font 25mm. Il suffit de visser les chapes 808647 sur les tiges filetées 808646
jusqu'à ce les chape arrivent à fleur l'une de l'autre. Attention au sens de montage
sur les boules alu (côté le plus ouvert vers la boule aluminium)
A
FREIN FILET
THREAD LOCK
25
25mm
All manuals and user guides at all-guides.com
Main rotor assembly
y
p
808450
808646
808450
g
A
808632
g
,
808020
808944

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bell uh-1d excellium 480 serie

Table des Matières