Gas Leakage Inspection - Haier AC092ACBHA Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation of Indoor Unit
(Fig. 17)
Arrange the drain hose
lower than this portion
When drain hose is arranged backward. Secure the drain hose with the VT wire. (Fig. 18)
(Fig. 18)
VT wire hole
Pass the drain hose through here
For series 14,18,24

GAS LEAKAGE INSPECTION

After connecting the piping, check the joints for gas leakage with gas leakage detector.
HOW TO CONNECT WIRING TO THE TERMINALS
A. For solid core wiring (or F-cable)(Fig.19A)
(1) Cut the wire with a wire cutter or wire-cutting pliers, then strip the insulation to about 25mm of the
exposed solid wire.
(2) Using a screwdriver, remove the terminal screw(s) on the terminal board.
(3) Using pliers, bend the solid wire to form a loop suitable for the terminal screw.
(4) Shape the loop wire properly, place it on the terminal board and tighten securely with the terminal
screw using a screw driver.
All manuals and user guides at all-guides.com
Remove the hole cover.
Drain hose
OK
VT wire hole
Drain hose
For series 28,36,42
Piping hole
Cut the grill
CAUTION
NO
Piping hole
Base (Bottom)
Intake grill
Drain hose
For series 28,36,42,
no this part
18
VT wire

Publicité

Table des Matières
loading

Table des Matières