Installing Your Appliance; Proper Positioning; Flush Mounting - De Dietrich DTE410 Guide D'installation Et D'utilisation

Table de cuisson
Masquer les pouces Voir aussi pour DTE410:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
99632084_ML_A.qxd
20/01/05

1 1 / / INSTALLING YOUR APPLIANCE

Fig. 01
• • PROPER POSITIONING
Your appliance shoud be built in the surface of
a support cabinet that is a minimum of 3 cm
thick, made of a material that resists heat or
that is covered with such a material.
So as not to disturb movement of cooking
utensils, there should not be to the right or left
or back any obstacle within 30 cm of the hob.
If a horizontal divider wall is positioned under
the hob, it should be placed between 10 cm
and 15 cm away from the top of the work top.
In any event, do not store aerosol cans or
containers
under
pressure
compartment that may exist under the hob
(See "Safety Recommendations" chapter).

FLUSH MOUNTING

• •
Follow the diagram (Fig. 01).
— Remove the pan supports, the burner covers
and burner heads; noting their positions.
— Turn the hob over and carefully place it on
top of the opening in the cabinet so as not to
13:30
Page 25
Total
3 cm min
dimensions
a a b b o o v v e e
the work
top
Total
dimensions
b b e e l l o o w w
the work
toptravail
damage the knobs and spark plugs.
— To ensure a tight seal between the housing
and the work top, glue the foam seal a a l l o o n n g g
t t h h e e e e x x t t e e r r i i o o r r e e d d g g e e o o f f t t h h e e h h o o u u s s i i n n g g before
installing the hob (Fig. 02).
Housing
in
any
Fig. 02
25
APPLIANCE
Width
Depth
Thickness
58 cm
52.2 cm
4.9 cm
55.4 cm
47.4 cm
3.5 cm
Seal

Publicité

Chapitres

Table des Matières
loading

Table des Matières