Accessories; Brine Circuit Manifold; Brine Controller; Remote Control - Dimplex SIKH 9 ME Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

SIKH 9ME
4

Accessories

4.1 Brine Circuit Manifold

The brine circuit manifold merges the individual collector loops of
the heat source system into a single main pipe which is con-
nected to the heat pump. Integrated ball valves allow the individ-
ual brine circuits to be shut off for de-aeration purposes.

4.2 Brine Controller

If required by the authorities, a low-pressure brine controller can
be installed in the device. In this case, the connection located up-
stream from the brine expansion vessel provided for this purpose
is to be used.

4.3 Remote control

A remote control adds convenience and is available as a special
accessory. Operation and menu navigation are identical to those
of the heat pump manager. Connection is made using a 6-core
telephone cable (special accessory) with modular plugs.
NOTE
In the case of heating controllers with a removable operating element,
this can also be used directly as a remote control.
4.4 Building management
technology
The heat pump manager can be connected to a building man-
agement system network via supplementation of the relevant in-
terface plug-in card. The supplementary installation instructions
of the interface card must be consulted regarding the exact con-
nection and parameterisation of the interface.
The following network connections can be made on the heat
pump manager:
Modbus
EIB, KNX
Ethernet
ATTENTION!
If the heat pump or circulating pump is controlled externally, an
additional flow rate switch is required to prevent the compressor from
being switched on when there is no volume flow.
EN-4
All manuals and user guides at all-guides.com

4.5 Thermal energy meter WMZ

4.5.1 General description
The thermal energy meter (WMZ 25/32) is used for measuring
the quantity of thermal energy supplied. It is available as an ac-
cessory. Due to the additional heat exchanger, two thermal en-
ergy meters are required for measuring the quantity of thermal
energy.
Sensors in the flow and return of the heat exchanger pipes and
an electronics module acquire the measured values and transmit
a signal to the heat pump manager, which, depending on the cur-
rent operating mode of the heat pump (heating/DHW/swimming
pool), totals the thermal energy in kWh and displays them in the
operating data and history menu.
NOTE
The thermal energy meter complies with the quality requirements of the
German market incentive programme subsidising efficient heat pumps.
The thermal energy meter is not subject to obligatory calibration, and can
thus not be used for the heating cost billing procedure!
4.5.2 Hydraulic and electrical
The thermal energy meter requires two measuring devices for
data acquisition.
The installation locations for both measuring tubes should be as
close to the heat pump as possible in the generator circuit.
To avoid eddying effects which could lead to incorrect measure-
ments, there should be a gap of 50 cm between the measuring
devices and other installed components such as pumps or
valves.
in the heating flow
452231.66.22 · FD 9204
integration of the thermal
energy meter
A measuring tube for the flow measurement
This must be installed in the heat pump flow (observe flow
direction).
A temperature sensor (copper pipe with immersion sleeve)
This must be installed in the heat pump return.
Thermal energy meter casing - electronics
in the heating return flow
L / N / PE
230 V / 50 Hz
24 V AC
N1 / IDX
Pulse, thermal energy meter
www.dimplex.de

Publicité

Chapitres

Table des Matières
loading

Table des Matières