Movement Installation; Lifting And Transporting The Packaged Machine; Delivery Checks; Unpacking - Dulevo SPARK 1000 BH Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1000 BH - 1000 EH - 1000 YH

Lifting and transporting the packaged machine

During all lifting operations, make sure the packaged machine is firmly secured to avoid it
Always load/unload lorries in adequately illuminated areas.
The machine is packaged on a wooden pallet by the Manufacturer. It must be loaded on to the trans-
porting vehicle using suitable equipment (see EC Directive 89/392 and subsequent amendments
and/or additions). At destination, it must be unloaded using similar means.
A fork lift truck must always be used to lift the packaged body of the machine. Handle with care to
avoid knocking or overturning the machine.

Delivery checks

When the carrier delivers the machine, make sure the packaging and machine are both whole and
undamaged. If the machine is damaged, make sure the carrier is aware of the damage and before
accepting the goods, reserve the right (in writing) to request compensation for the damage.

Unpacking

When unpacking the machine, the operator must be provided with the necessary personal
protection devices (gloves, goggles, etc.) to limit the risk of injury.
Proceed as follows to unpack the machine.
Cut and remove the plastic straps using scissors or nippers.
Remove the cardboard packaging.
Remove the bags from the battery compartment and check their contents:
this Operator's Manual, the maintenance manual, declaration of conformity, certificate of
warranty; battery bridges with terminals; connector for battery charger.
Depending on the model, remove the metal brackets or cut the plastic straps fixing the machine
chassis to the pallet.
Using a sloping ramp, push the machine backwards off the pallet.
Unpack the brushes from their packaging.
Clean the outside of the machine, taking care to respect safety regulations.
Once the machine is clear of the packaging, proceed to install the batteries (see the "Batteries:
installation and connection" section).
The packaging may be kept and reused to protect the machine if it is moved to another site or to a
repair workshop.
Otherwise it must be disposed off in compliance with current legislation.

Batteries (EH version)

Two different types of battery may be installed on these machines:
Leak-proof tubular batteries: these require regular checks on electrolyte level. When nec-
essary, top up with distilled water until the plates are covered. Do not over-fill (5 mm max.
above the plates).
Gel batteries: this type of battery requires no maintenance.
Battery technical characteristics must correspond to those listed in the Technical characteristics
section. The use of higher capacity batteries could seriously jeopardise manoeuvrability and lead to
the drive motor overheating. Batteries with a lower capacity and weight will require charging more
frequently.
Batteries must be kept charged, dry and clean and the connections must be kept tight.

MOVEMENT INSTALLATION

! WARNING!
tipping up or being accidentally dropped.
! WARNING!
2014-07
English
EN-21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Spark 1000 ehSpark 1000 yh

Table des Matières