pellet vent termination

The vent termination must have an approved cap (to prevent water from entering) or a 45° downturn.
If the termination is located on a windy side of the house, a shield is recommended to prevent soot from
building up on the side of the house.
Horizontal terminations must protrude 12" (305mm) from the wall, vertical terminations require a minimum 24"
(610mm) above the highest point that it penetrates through the roof.
Depending on pellet quality, vent configuration and air settings, black soot may occur on the terminal wall.
4.5

vent terminal clearances

CLEARANCES
A
12" (30.5cm)
9" (22.9cm)*
B
12" (30.5cm)*
18"
C
(45.7cm)
D
0" (0mm)
E
3" (75mm)
F
9" (22.9cm)
G
3' (0.9m)
H
7' (2.1m) **
I
12" (30.5cm)**
J
24" (61cm)
K
2' (0.6m)
3' (0.9m) within a
height of 15 feet
L
(13.7m) above the
meter / regulator
assembly
*
Recommended to prevent condensation on windows and thermal breakage
**
This is a recommended distance. For additional requirements check local codes.
NOTE: Wall terminals are for illustration purposes only. Size and shapes may vary.
NOTE: Illustration dimensions are to the center of the exhaust exit point of the vent.
B
D
A
Clearance above grade, veranda porch, deck or balcony. (Including vegetation and mulch)
Clearance beside or below any windows or doors that open.
Clearance above any window or door that opens.
Vertical clearance to ventilated soffi t located above the terminal within a horizontal distance of 2 feet
(0.6m) from the center line of the terminal.
Clearance to an outside corner wall.
Clearance to an inside combustible corner wall or protruding combustible obstructions (vent chase, etc.)
Clearance to a non-mechanical air supply inlet to the building or a combustion air inlet to any other appliance.
Clearance to a mechanical air supply inlet.
Clearance above a paved sidewalk or paved driveway located on public property.
Clearance under a veranda, porch, deck or balcony.
Clearance above the roof.
Clearance from an adjacent wall including neighbouring buildings.
Clearance to each side of center line extended above natural gas or propane meter / regulator assembly
or mechanical vent.
E
C
K
J
L
E
19
I
B
F
G
H
12.7D
W415-1472 / B / 02.05.18