Monthly Maintenance; External Maintenance - IDC MIKRO ic Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

NOTE:
Incorrect installation!
▷ To screw the collet into the spindle, insert a
tool into the open collet.
▷ Screw the cleaned and lubricated collet in
reverse order to the stop back into the spindle.
CAUTION:
Danger of tool breakage!
▷ Make sure to remove the tool from the collet
chuck!
When the tool was from the milling machine's
blank holder:
▷ Place the tool properly positioned back into the
blank holder.
▷ End the cleaning via the operational display.
C/L nozzles
Do not clean the C/L nozzles with the col-
let brush!
▷ Inspect the C/L nozzles weekly.
▷ If required, clean the outlet hole using a fine,
flexible needle.
Fig. 19 Cleaning the C/L nozzles
C L E A N I N G A N D M A I N T E N A N C E
8.3

Monthly maintenance

Checking the zero point
It is recommended to check the zero point once
every month.
8.4

External maintenance

External maintenance is necessary after a defined
number operating hours. The milling machine
software will display an appropriate message.
E N
47

Publicité

Table des Matières
loading

Produits Connexes pour IDC MIKRO ic

Ce manuel est également adapté pour:

179625

Table des Matières