Installation

5.1

Milling machine

5.1.1
Countries with 100 - 115 V mains volt-
age
The machine is preset for a mains voltage of
230 V. When the mains voltage at the set-up loca-
tion is 100 - 115 V:
▷ Pull out the fuse compartment ([8] in Fig. 3 on
page 33) below the mains plug.
▷ Replace both T3.15 A fuses with the provided
T6.3 A fuses.
5.1.2
Setting up the milling machine
_ The machine is intended exclusively for use
within dry, closed rooms.
_ A clearance of at least 200 mm is to be
observed sidewards, to the rear and upwards.
Minimum space requirements for the milling
machine (incl. connections):
▪ Width: 1040 mm
▪ Depth: 670 mm
▪ Height: 750 mm
_ The empty weight of the machine is 70 kg. The
set-up surface must withstand an appropriate
load.
_ During operation, the room temperature must
be between 18 °C and 30 °C; avoid large varia-
tions in temperature.
▷ Set up the machine on a sturdy work table or
work bench (off the ground and clear of walls).
▷ Adjust the height of the machine by screwing
the feet in or out, ensuring that the machine is
positioned firmly on all four feet.
▷ -Connect the machine to the power supply con-
nection ([7] in figure 3) using the original mains
cable (delivery scope).
I N S T A L L A T I O N
When the machine is being connected via the USB
interface ([3] in figure 3):
▷ Only use the USB cable from the delivery scope.
▷ Directly connect the cable to a USB port of the
PC.
When using a USB switch/hub, the function of
the machine will not be sufficiently ensured.
5.2

Setting up the supply unit

Set up the supply unit below the work table/bench
of the milling machine.
In order for the C/L drain pipe to be mounted, the
table must be set up with a certain clearance to
the wall (see set-up instructions).
▷ Fill coolant/lubricant into the C/L container (see
section 7.4 on page 44).
▷ Connect the C/L supply line to the milling
machine and the supply unit.
▷ Plug the C/L drain pipe together and connect it
to the milling machine and the supply unit (see
set-up instructions).
▷ Set up the C/L container.
5.3

Service unit

The Jäger spindle is equipped with a sealing-air
feature. This sealing air prevents shavings/chips
and dust from entering the spindle. The service
unit filters possible contamination in the sealing
air and thus prevents costly machine damage.